Adam Hingston
Menu

Together, Apart.   /   Shared infrastructure

Data centre
heat recovery

Southwark Grounds   /   Adelaide, South Australia

The data centre extends the idea of shared resources within Together, Apart. Located beneath the development, it provides an opportunity to investigate how heat from computing equipment could support the homes and shared facilities above. This preliminary study considers how that connection could work and how it might extend to neighbouring buildings as Southwark Grounds develops.

Research question

How could a data centre contribute heat to the housing above while allowing the shared energy network to grow with the surrounding precinct?

Development and infrastructure

A shared building-services network

The proposal brings the data centre, housing and ground-floor facilities into a shared building-services network. Recovered heat supplies a hydraulically separated residential radiator circuit with independent household controls. Balanced energy-recovery ventilation is a separate system, with accessible equipment above bathroom ceilings and sealed ducts routed through planned service zones. Summer cooling is provided by separate zoned heat-pump units, supported by shading, ceiling fans and favourable night ventilation.

The bakery/deli, bars, communal laundry and studio provide further programmes to consider within this network. Their different patterns of use would need to inform how heat is distributed, with connections to future precinct buildings developed in stages.

38independent apartments
~100residents
3,081.93 m²scheduled apartment floor area
1,750 m²gross basement allocation for the data centre and supporting infrastructure
829 m²gross roof area considered for photovoltaic generation
0–150 kWstaged compute load explored in this study

A shared thermal network

From computing equipment to the homes above

I am investigating liquid cooling as a way to capture heat from the computing equipment and transfer it into a water-based system. A heat exchanger connects this circuit to the central energy plant, where water-to-water heat pumps raise the temperature for use in the building. A thermal buffer provides some flexibility between when heat is produced and when it is needed.

The network connects the basement infrastructure with the apartments and communal facilities above. Water returns through closed circuits, while independent heat rejection allows the data centre to operate when the building cannot use the available heat. The value of this arrangement depends on how much heat can be put to use and the energy required to recover and distribute it.

  1. 01Computing

    The data centre produces heat while operating. The study explores staged compute loads from 0 to 150 kW; heat output grows with the operating IT load.

  2. 02Capture

    Liquid cooling carries heat through a water-based circuit to a heat exchanger.

  3. 03Upgrade and buffer

    The central plant uses water-to-water heat pumps; thermal storage helps manage short-term differences in demand.

  4. 04Distribute

    Hydronic circuits supply apartments and shared facilities, with staged connections for future buildings.

  5. 05Return or reject

    Water returns through closed circuits. Independent heat rejection remains available when demand is too low.

Annual energy estimates

Following the heat through the system

Explore how heat availability changes as compute is brought online, from 0 to 150 kW of operating IT load. The slider represents a continuous load at each stage, rather than installed capacity or a construction timetable.

150 kWgross IT heat while operating
127.5 kWtheoretically capturable source heat at 85%

Annual heat availability scales with compute. Useful heat is limited to the existing 190 MWh/year study target and the source heat available at an assumed heat-pump COP of 5. This is an annual energy ceiling: seasonal demand, temperatures and operating hours may reduce actual heat use.

Gross IT heat generation1,314 MWh/year
Theoretically capturable source heat at 85%1,116.9 MWh/year
Estimated heating and domestic hot water demand239.5 MWh/year
Potential useful heat supplied · capped at study target190 MWh/year
Recovered source heat used at COP 5152 MWh/year
Capturable source heat not allocated to this target964.9 MWh/year

All bars use the same fixed scale: 0–1,314 MWh/year. Unallocated source heat may serve future connections, or require rejection; it is not a prediction of heat exported to the precinct.

152 MWhrecovered source heat
+
38 MWhheat-pump electricity
=
190 MWhpotential useful heat

Potential supply covers 79.3% of estimated annual demand; 49.5 MWh/year remains for other heat sources.

Calculation assumptions

Gross IT heat = operating compute load × 8,760 hours ÷ 1,000 (MWh/year). Capturable source heat = gross IT heat × 85%. Potential useful heat = the smaller of 190 MWh/year or capturable source heat ÷ (1 − 1/5). Heat-pump electricity = useful heat ÷ 5; recovered source heat used = useful heat − heat-pump electricity.

These retain the preliminary assumptions of this study, not verified equipment performance. At 0 kW, compute-derived heat and associated heat-pump electricity are zero; building demand remains. Standby loads, data-centre cooling and distribution energy are excluded. Rooftop solar, rainwater and the indicative buffer below are separate fixed project estimates and do not scale with compute.

20–30 m³indicative thermal buffer
113 kWpestimated rooftop photovoltaic capacity
158 MWh/yearestimated photovoltaic generation
351 kL/yearpotential rainwater collection

Annual heat calculations assume continuous operation at the stated IT load. Actual output will depend on utilisation and operating conditions. Photovoltaic generation and rainwater collection are separate estimates, not a verified whole-building balance.

Infrastructure that links independent programmes

Shared services, independent households

Connecting through the building

The system introduces a relationship between the basement plant, individual homes and shared ground-floor facilities. Supply and return routes can be traced through the building section, with separate branches serving different programmes.

Allowing for future connections

The initial development could form the starting point for a wider precinct network. Providing for staged connections creates an opportunity to share heat with neighbouring buildings as they develop. The extent of that network would depend on their requirements and patterns of use.

Responding to changing demand

The data centre may produce heat continuously, while demand for space heating and hot water varies. Thermal storage can help manage short-term differences. Independent heat rejection remains part of the system for periods when the available heat exceeds what can be used.

Independent homes, shared resources

The energy plant gives the homes and communal facilities a shared source of infrastructure while allowing them to operate independently. This carries the project’s position beyond the dwelling arrangements. Residents can retain control over their own domestic environment while drawing on a resource shared across the development.

What remains to be tested

Further technical work

The study gives me a basis for considering how heat recovery could be incorporated into the proposal. Further work would need to establish the equipment, operating conditions, building demand and servicing requirements. These would determine how much of the available heat could be used and what would be required to deliver it.

Design conclusion

At the upper compute stages, the preliminary study suggests that the proposed data centre could provide more recoverable heat over a year than the initial development requires. This shifts attention towards when the heat is needed, the temperatures required and the routes through which it could be distributed.

For Together, Apart, the data centre offers a way to connect independent homes and shared programmes through the infrastructure supporting them. Future precinct connections could extend that contribution beyond the site. The environmental value of the proposal would depend on the heat actually used, alongside the energy and equipment required to recover and distribute it.